ROTATING EQUIPMENT INSTALLATION PROCEDURE
6.3.6 Sole plate installation and levelling as per API 686. 6.4 Grouting and Anchor Bolt Tightening 6.4.1 Grouting for the base plate shall be done after completion of the shaft pre alignment and
Installation of Static Machinery Procedure
Installation of Static Machinery Procedure. Secure work permit and other applicable approved documents prior to work commence. Tools and equipment shall be made operational and available for use. Ensure tools are color coded